ForeFront Power

CompanyWebsite

About

ForeFront Power says it develops and builds energy projects and procurement strategies to support customers’ energy needs.

Upcoming events (2)

FEB

9

TUE

–

FEB

11

THU

IESNA Flagship Event
In-Person · San Diego, CA
Energy
Policy
Technology
Batteries & Energy Storage · Power & Utilities · Renewables

Sessions address FEOC compliance and tax-credit eligibility; transmission-queue interconnection and network upgrades; storage-project diligence and financing; post-ITC EPC strategy; BESS fire-safety permitting, including UL 9540A and NFPA 855; residential electrification; C&I project development; and data-center power demand. Peer roundtables cover mid-market interconnection barriers, BESS commissioning through year one, and domestic-content sourcing. Workshops cover electrotechnology operations and maintenance, PV ground-fault troubleshooting, commercial-scale PV design, NEC conductor and overcurrent sizing, and Article 705 interconnection. Other program topics include solar and storage policy, peak-demand revenue, and ERCOT project economics.

FEB

9

TUE

–

FEB

11

THU

Intersolar & Energy Storage North America Flagship Event
In-Person · San Diego, CA
$60 – $1,390
Energy
Finance
Policy

The program covers residential, commercial and industrial, and utility-scale solar and storage, with discussion of tax-credit deadlines, tariff and sourcing rules, permitting reform, interconnection, storage financing, and data-center-driven demand. The keynote “State of the Industry: A Candid Look at Where Solar and Storage Stand” examines policy volatility, tax credits, tariffs, and market consolidation. Another keynote features a live recording of the Energy Empire podcast about forces reshaping America’s clean energy buildout. “Designing Commercial-Scale PV: Three-Phase, the NEC, and Interconnection” addresses service configurations, conductor and overcurrent-protection sizing, and Article 705 interconnection. “The Mid-Market Interconnection Bottleneck” considers delays for mid-sized projects, utility perspectives, and possible reforms. “The New Rules for EPCs, Post-ITC” examines compressed schedules, supply constraints, milestone risks, and the post-safe-harbor landscape for utility-scale and C&I projects. Storage and grid topics include FEOC requirements, OEM and warranty structures, augmentation, and revenue assumptions in project financing; FERC Order 2222 and state virtual power plant mandates; and BESS fire-safety planning under UL 9540A and NFPA 855, including early engagement with authorities having jurisdiction. Other sessions address peak-demand revenue from capacity, ancillary services, demand response, and arbitrage; ERCOT load growth and large-load interconnection; and financing, interconnection, and construction for data-center power projects. Workshops cover commercial PV fundamentals and O&M practices including NFPA 70B, infrared thermography, and PV ground-fault troubleshooting. Roundtables address operational and business challenges involving supply chains, policy, financing, and market access. Conference passes cover sessions, roundtables, keynotes, and Braindate; workshops require separate purchase, while Exhibit Hall Only passes include access to keynotes.

Past events (0)

No past events are listed for this company.