Methane Abatement Rulemaking Hearing – EIB 26-78 (R)

Save event & get reminders

Date

December 1

Time

9:00 AM MT

Format

Hybrid

Location

Santa Fe, NM

Energy
Policy
Technology
Oil & Gas

Importance:

Standard

About

The Environmental Improvement Board will consider NMED’s petition to adopt proposed new rule 20.2.51 NMAC, Methane Abatement. The proposal would establish a state methane super-emitter program: qualified entities could seek certification as third-party notifiers and submit detections made with approved remote methane-sensing technologies. A super-emitter event is defined as a detected emissions event with a quantified methane rate of at least 50 kg/hr. NMED would review notifications and provide them to owners or operators of sources within 50 meters; operators would investigate the event, repair responsible leaks, and report their findings to NMED. The proposal would also require zero methane emissions from designated facilities with natural-gas-driven process controllers, including gathering and boosting stations, processing plants, tank batteries, transmission compressor stations, and well sites. It sets out exemptions, closed-vent-system design and operating requirements, inspections of closed-vent systems and self-contained controllers, and annual reporting of inspections and repairs. The hearing is open to the public and allows technical testimony, general public testimony, written comments, and cross-examination. The Board may act on the proposal after hearing the testimony and evidence.

Funding programs

Beta

Find open federal and state grants, loans, tax credits and other programs relevant to this event and the people you'll meet there, including programs in other states if you're weighing where to build.

11 open programs share this event's industries. Find which ones fit.

Also in Santa Fe that week

In-person events within 3 days of this one, so one trip can cover more.

DEC

1

TUE

–

DEC

8

TUE

EIB 26-78 (R): Proposed Adoption of 20.2.51 NMAC – Methane Abatement
Hybrid · Santa Fe, NM
Energy
Policy
Sustainability
Oil & Gas

The Environmental Improvement Board will hear testimony, evidence, and public comment on NMED’s petition to adopt proposed rule 20.2.51 NMAC, Methane Abatement. The board may deliberate and act on the proposal at the hearing’s conclusion or meet later to consider action. The hearing is open to the public; technical testimony is given under oath or affirmation and is subject to cross-examination. Members of the public may also provide oral or written nontechnical comments. The proposed rule would establish a state methane super-emitter program modeled after the federal program. Certified third-party notifiers could submit reports of remotely detected events with quantified emissions of at least 50 kg/hr; NMED would review notifications and send them to owners or operators of sources within 50 meters, who would investigate, repair leaks, and report their findings. The rule also proposes zero-methane requirements for natural-gas-driven process controllers at designated oil and gas facilities, along with closed-vent-system and controller inspection requirements and annual reporting. The hearing will consider the proposed rule, petition, and statement of reasons.

Related events

DEC

1

TUE

–

DEC

8

TUE

EIB 26-78 (R): Proposed Adoption of 20.2.51 NMAC – Methane Abatement
Hybrid · Santa Fe, NM
Energy
Policy
Sustainability
Oil & Gas

The Environmental Improvement Board will hear testimony, evidence, and public comment on NMED’s petition to adopt proposed rule 20.2.51 NMAC, Methane Abatement. The board may deliberate and act on the proposal at the hearing’s conclusion or meet later to consider action. The hearing is open to the public; technical testimony is given under oath or affirmation and is subject to cross-examination. Members of the public may also provide oral or written nontechnical comments. The proposed rule would establish a state methane super-emitter program modeled after the federal program. Certified third-party notifiers could submit reports of remotely detected events with quantified emissions of at least 50 kg/hr; NMED would review notifications and send them to owners or operators of sources within 50 meters, who would investigate, repair leaks, and report their findings. The rule also proposes zero-methane requirements for natural-gas-driven process controllers at designated oil and gas facilities, along with closed-vent-system and controller inspection requirements and annual reporting. The hearing will consider the proposed rule, petition, and statement of reasons.

NOV

19

THU

NDIC Docket for Thursday, November 19, 2026 09:00 AM
In-Person · Bismarck, ND
Energy
Policy

The docket includes applications concerning Bakken and Three Forks field rules, pool boundaries, spacing units, well authorizations, and pooling of interests. Other matters address commingling oil and gas production at central production facilities and applications to drill vertical or directional saltwater-disposal wells under NDAC Chapter 43-02-05. Cases 33335–33375 include applications from operators including 1776 Disposals, Cornerstone Natural Resources, Continental Resources, EOG Resources, Devon Energy, Hunt Oil, Phoenix Operating, KODA Resources, Formentera Operations, Heberdev Operating, and Argent Midstream Solutions.

NOV

18

WED

NDIC Docket for Wednesday, November 18, 2026 9:00 AM
In-Person · Bismarck, ND
Energy
Policy

The docket lists North Dakota Industrial Commission oil-and-gas applications concerning Bakken Pool spacing units, field-boundary amendments, and horizontal-well authorizations; pooling interests; commingling oil, gas, and vapor-recovery unit gas at central production facilities, including well-testing procedures; and authorizations for Dakota Group saltwater-disposal wells and a permit modification. Applications cite NDCC § 38-08-08 and NDAC §§ 43-02-03-88.1 and 43-02-03-48.1, as well as NDAC Chapter 43-02-05.

NOV

17

TUE

Case 9818 – Messick Road-Ridgeley Transmission Line Evidentiary Hearing
In-Person · Baltimore, MD
Energy
Engineering
Policy
Power & Utilities

The Potomac Edison Company’s application seeks a Certificate of Public Convenience and Necessity to rebuild the Messick Road-Ridgeley 138-kilovolt transmission line in Allegany County, Maryland. The proceeding is an en banc evidentiary hearing.

DEC

11

FRI

Case No. PC72 - Large Load Customer Regulations and Tariffs Interconnecting to the Electric System Servicing Maryland - Legislative-Style Hearing
In-Person · Baltimore, MD
Energy
Policy
Technology

En banc legislative-style hearing in Case PC72 concerning large load customer regulations and tariffs interconnecting to the electric system serving Maryland.

JAN

19

TUE

–

JAN

21

THU

Technical Hearing on Electric Utility’s Application to Study Distribution of Costs
Hybrid · Boise, ID
Economics
Energy
Policy
Power & Utilities

The hearing concerns Idaho Power’s petition to evaluate its Class Cost-of-Service methodology, consider alternative Class Cost-of-Service studies, and determine cost-of-service considerations for new large-load customers. Parties may present proposals, witnesses, testimony, and exhibits, with questions following presentations and witness testimony. The public may listen to or watch the proceedings.

APR

18

SUN

–

APR

21

WED

NMSU Center for Public Utilities 2027 Current Issues Conference
In-Person · Santa Fe, NM
$1,095 – $1,695
Economics
Energy
Policy
Power & Utilities

Industry leaders and commissioners discuss issues facing the electric, natural gas, water, and telecommunications industries. The program includes a CEO and Industry Leaders Panel on “The Future of the Industry” and a Commissioner Grill where conference participants submit questions to moderators.

DEC

9

WED

Case No. PC72 - Large Load Customer Regulations and Tariffs Interconnecting to the Electric System Servicing Maryland - Legislative-Style Hearing
In-Person · Baltimore, MD
Energy
Policy
Technology

The proceeding concerns large-load customer regulations and tariffs interconnecting to the electric system servicing Maryland.

FEB

24

WED

–

FEB

25

THU

27 MWM Flow Measurement Workshop
In-Person · The Woodlands (Houston), TX
$175 – $625
Engineering
Sustainability
Technology
Batteries & Energy Storage · Oil & Gas

Co-hosted by SPE FMTS and TÜV SÜD NEL, this technical forum focuses on defensible, traceable flow measurement for production, allocation, custody transfer, emissions reporting, regulatory compliance, commercial settlement, and emerging-energy applications. The program is being developed around six technical sessions, with moderated discussion and posters; final session groupings are to be set after abstracts are reviewed. Topics include field measurement challenges across changing operating conditions and brownfield or offshore installations; meter design, manufacturing controls, technology selection, and quality assurance; calibration, qualification, laboratory-to-field transferability, and uncertainty; deployment, diagnostics, data quality, and continuous assurance; single-phase measurement, custody transfer, and allocation; CCUS, hydrogen, methane, and emerging-energy measurement; and validation, governance, and decision-grade evidence. Specific issues include meter performance limits, sensor and meter-body design, traceability, reference quality, commissioning and configuration control, anomaly detection, fiscal measurement assurance, emissions evidence, uncertainty propagation, and criteria for recalibrating, repairing, or replacing meters.

Track every Oil & Gas event across the US

630+

sources monitored

All 50

US states

2,338

reviewed in 30 days

132

curated

  • Saved filters
  • Email alerts
  • Calendar sync
  • AI search assistant
Sign up