Paul Savard

Acting Director, Tunnel Redundancy Program at MWRA

About

Paul Savard is identified as MWRA’s Acting Director of the Tunnel Redundancy Program. Savard is presenting on MWRA’s Metropolitan Water Tunnel Program, which includes plans for two deep pressure tunnels and 13 shafts.

Upcoming events (1)

JAN

19

TUE

UCA George A. Fox Conference
In-Person · New York, NY
$175 – $935
Engineering
Innovation
Technology

Technical presentations cover the Pleasure Bay Interceptor Recovery Tunnel, the Palisades Tunnel Project, Ellicott City flood resilience, East River Tunnels rehabilitation, and ground stabilization for the Hudson River Tunnels. Other topics include Italian high-speed rail tunnel design and construction, the Manhattan Tunnel Project and ground freezing, jet-grouting safe havens on the Lower Olentangy Tunnel Project, the BART Silicon Valley Phase II extension, and the MWRA Metropolitan Water Tunnel Program. The program also includes a project update on the Gateway Hudson Tunnel and an update on the U.S. tunneling industry, including major projects, construction methods, market drivers, and trends.

Organizers

Organizations behind the events this speaker has appeared at.

Past events (0)

No past events are listed for this speaker.