Oil Conservation Division Hearings
Date
October 8
Time
8:30 AM MT
Format
Hybrid
Location
Santa Fe, NM
Importance:
About
Docket No. 39-26 includes a notice-of-violation case involving Kenemore Welding and Oilfield Services, Inc., with alleged violations of 19.15.25.8 and 19.15.5.9(A) NMAC. The docket also covers compulsory-pooling, non-standard spacing, overlapping horizontal spacing, additional-interest pooling, and drilling-deadline matters involving Coterra Energy Operating Co., FED Operating, MRC Permian Company, Longfellow Energy, Permian Resources Operating, Spur Energy Partners, E.G.L. Resources, Mewbourne Oil Company, Greyhound Resources, and Marathon Oil Permian. Issues include Bone Spring, Wolfcamp, San Andres, Avalon, and Second Bone Spring formations; well spacing and unit designations; operator designation; allocation of drilling, completion, and operating costs; risk charges; amendments to prior orders; and extensions of drilling deadlines. Presenting parties must identify disputed facts and issues, witnesses and qualifications, exhibits, and written testimony in pre-hearing statements.
Funding programs
Find open federal and state grants, loans, tax credits and other programs relevant to this event and the people you'll meet there, including programs in other states if you're weighing where to build.
11 open programs share this event's industries. Find which ones fit.
Related events
NOV
19
THU
The docket includes applications concerning Bakken and Three Forks field rules, pool boundaries, spacing units, well authorizations, and pooling of interests. Other matters address commingling oil and gas production at central production facilities and applications to drill vertical or directional saltwater-disposal wells under NDAC Chapter 43-02-05. Cases 33335–33375 include applications from operators including 1776 Disposals, Cornerstone Natural Resources, Continental Resources, EOG Resources, Devon Energy, Hunt Oil, Phoenix Operating, KODA Resources, Formentera Operations, Heberdev Operating, and Argent Midstream Solutions.
NOV
18
WED
The docket lists North Dakota Industrial Commission oil-and-gas applications concerning Bakken Pool spacing units, field-boundary amendments, and horizontal-well authorizations; pooling interests; commingling oil, gas, and vapor-recovery unit gas at central production facilities, including well-testing procedures; and authorizations for Dakota Group saltwater-disposal wells and a permit modification. Applications cite NDCC § 38-08-08 and NDAC §§ 43-02-03-88.1 and 43-02-03-48.1, as well as NDAC Chapter 43-02-05.
DEC
1
TUE
The Environmental Improvement Board will consider NMED’s petition to adopt proposed new rule 20.2.51 NMAC, Methane Abatement. The proposal would establish a state methane super-emitter program: qualified entities could seek certification as third-party notifiers and submit detections made with approved remote methane-sensing technologies. A super-emitter event is defined as a detected emissions event with a quantified methane rate of at least 50 kg/hr. NMED would review notifications and provide them to owners or operators of sources within 50 meters; operators would investigate the event, repair responsible leaks, and report their findings to NMED. The proposal would also require zero methane emissions from designated facilities with natural-gas-driven process controllers, including gathering and boosting stations, processing plants, tank batteries, transmission compressor stations, and well sites. It sets out exemptions, closed-vent-system design and operating requirements, inspections of closed-vent systems and self-contained controllers, and annual reporting of inspections and repairs. The hearing is open to the public and allows technical testimony, general public testimony, written comments, and cross-examination. The Board may act on the proposal after hearing the testimony and evidence.
DEC
1
TUE
–
DEC
8
TUE
The Environmental Improvement Board will hear testimony, evidence, and public comment on NMED’s petition to adopt proposed rule 20.2.51 NMAC, Methane Abatement. The board may deliberate and act on the proposal at the hearing’s conclusion or meet later to consider action. The hearing is open to the public; technical testimony is given under oath or affirmation and is subject to cross-examination. Members of the public may also provide oral or written nontechnical comments. The proposed rule would establish a state methane super-emitter program modeled after the federal program. Certified third-party notifiers could submit reports of remotely detected events with quantified emissions of at least 50 kg/hr; NMED would review notifications and send them to owners or operators of sources within 50 meters, who would investigate, repair leaks, and report their findings. The rule also proposes zero-methane requirements for natural-gas-driven process controllers at designated oil and gas facilities, along with closed-vent-system and controller inspection requirements and annual reporting. The hearing will consider the proposed rule, petition, and statement of reasons.
JAN
13
WED
–
JAN
15
FRI
Docket 26-035-20 concerns PacifiCorp d/b/a Rocky Mountain Power’s application for approval and report of the sale of the Washington Service Area and an accounting order. Parties must have their witnesses in attendance and prepared to testify. The scheduling order establishes testimony, intervention, and discovery deadlines, and requires parties to supplement discovery responses when new, different, or corrected information becomes available.
NOV
17
TUE
–
NOV
18
WED
Docket No. 26-2666-01 concerns Corix Utah City Heating and Cooling LLC’s application to establish a thermal tariff, including rates and terms of service. Parties must have their witnesses present and prepared to testify.
OCT
25
MON
A contested evidentiary hearing on Otterdale Mill Road Md PV LLC's application for a certificate of public convenience and necessity for a 3.0 MW solar photovoltaic generating facility in Carroll County.
DEC
11
FRI
En banc legislative-style hearing in Case PC72 concerning large load customer regulations and tariffs interconnecting to the electric system serving Maryland.
SEP
9
THU
A contested evidentiary hearing concerning LSE Lumen LLC's application for a certificate of public convenience and necessity for a 3 MW solar photovoltaic generating facility in Garrett County.
Track every Oil & Gas event across the US
630+
sources monitored
All 50
US states
2,338
reviewed in 30 days
132
curated
- Saved filters
- Email alerts
- Calendar sync
- AI search assistant